The piston pump factory carries on the detailed analysis to its safe operation instruction

Author : Xiong Date : 2019/5/22 7:39:57
The piston pump factory carries on the detailed analysis to its safe operation instruction

When working in the factory, it is easy to cause a series of safety accidents because of a small rule error. From this, we can see how important it is for our safety to abide by the safe operation rules. Only in this way, can effectively prevent the occurrence of accidents. In the operation of the plunger pump, also has its safe operating procedures, the following plunger pump manufacturers for its safe operating procedures for a detailed analysis, hope to help you fully understand. General safety operation regulations:
 
1. Check whether the safety valve, pressure gauge, water level gauge and liquid level indicator are sensitive and correct; The pressure gauge and the safety valve shall be calibrated once a year. The safety valve shall be regularly tested for exhaust to prevent the spool from sticking and the valve hole from being blocked.
 
2. Check whether the oil level of the reducer oil tank, three-plunger high-pressure pump and emulsion tank are at the specified oil level and water level;
 
 
 
3, check all parts of the pump, the valve, solenoid valve, pipeline is good, no water leakage, air leakage, oil leakage, check the electrical zero (ground) line is solid and reliable, stop the pump for more than a week, to measure the insulation of the main motor is good; Check whether the connection signal with hydraulic press is correct and reliable;
 
4. When opening and closing the valve, stand on the side of the stem and rotate slowly;
 
5, can not leave work at work, closely monitored control instrument and water level indicator light is normal, such as false water level, immediate measures should be taken, and every 10 ~ 15 minutes for all equipment inspection tour again, record every hour operation, emulsion temperature shall not exceed 60 ℃, cooling water temperature shall not be more than 40 ℃, the motor temperature shall not exceed the rated temperature rise;
 
6. If overpressure is found, unplug the pressure plug immediately and cut off the total power supply. After the water level drops to normal, inform the hydraulic press to stop working. Only after the repair is restored to normal, can the work be resumed;
 
7, with soap water to check the storage (gas) tank, gas valve, whether the air pipe leakage, if there is a cold condensation frost (water), that leakage is serious, should be repaired in time. If you want to thaw, disable open fire;
 
8, the plunger pump should maintain a certain oil level, generally should maintain the oil immersion surface of six to seven tenths of the position, found insufficient oil, should be timely refueling, to ensure the normal operation of the equipment;
 
9. All exposed rotating parts in the system must be equipped with a safe and reliable protective cover. Do not turn on when the protective cover is removed. Under special circumstances, there must be detailed and strict supervision and prevention measures;
 
10. Movable protective railing shall be set around the system. It shall not be removed or moved during normal operation. Non-operators are not allowed to enter during operation;
 
11. This system is a high-pressure working equipment, and the management and operation of corresponding containers shall be strictly in accordance with relevant national regulations.
 
Ok, the above is the plunger pump manufacturers for you to analyze the safety of the plunger pump operating procedures, you understand it? If you have any questions, please feel free to contact us.