Pressure switch,piston pump,vane pump, air cooler
进入中文版  中文版 进入英文版  ENGLISH

Products list
MSN: zfhydraulic@hotmail.com
Skype: zfhydraulic
Name: William Xiong
Tel: 86-135-09210189
Fax: +86-0755-66813786
Mobile: +86-13509210189
Add: NO. 3, Anhua Industrial Zone, Area 35, Xin'an St., Baoan Dist, Shenzhen, Guangdong Province, China
E-mail: zfhydraulic@hotmail.com
E-mail:

How to vent the accumulator

Author : Zhou Date : 2018/10/22 20:46:19
How to vent the accumulator

1. Place the accumulator vertically, and screw down the protective nut above the accumulator and the protective nut of the charging valve;
 
2. Turn the handle of the air charging tool to the left until the top bar is level with the shoulder;
 
3. Screw the adapter nut (M14*1.5) of the filling valve with the filling valve;
 
4. Tighten the air release valve;
 
5. Turn the right inflating tool handle to open the accumulator filling valve and observe the indicator value of the pressure gauge. This value is the inflating pressure value of the accumulator.
 
6. Open the air valve, release the energy accumulator, observe the pressure gauge indicating value, and when it reaches the required value, turn the air filling tool handle to the left until the energy storage valve closes, open the air valve and unscrew the air filling tool from the air filling valve.

The above:Accumulator air tightness inspection period