Pressure switch,piston pump,vane pump, air cooler
进入中文版  中文版 进入英文版  ENGLISH

Products list
MSN: zfhydraulic@hotmail.com
Skype: zfhydraulic
Name: William Xiong
Tel: 86-135-09210189
Fax: +86-0755-66813786
Mobile: +86-13509210189
Add: NO. 3, Anhua Industrial Zone, Area 35, Xin'an St., Baoan Dist, Shenzhen, Guangdong Province, China
E-mail: zfhydraulic@hotmail.com
E-mail:

Daily maintenance of waste paper baling machine

Author : Xiong Date : 2018/8/3 22:29:52
Daily maintenance of waste paper baling machine

The daily maintenance of waste paper baling machine, usually daily and weekly maintenance, also known as daily and weekly maintenance.
1. Day cases confirmed
 
(1) check whether there is any oil leakage in the tubing parts before the shift. Wipe the equipment and lubricate the oil as required. Check all parts of the link shaft pin, reliable. Empty operation to check the sound of waste paper packaging machine is normal.
 
(2) pay attention to the sound of operation in the class, and whether the temperature, pressure, liquid level, electricity, hydraulic pressure and safety insurance of the equipment are normal.
 
(3) after work, close the switch, remove the paper scraps and dirt, clean the oil on the guide rail surface and sliding surface of the equipment, and add oil. Clean up the work area and tidy up the accessories and tools. Fill in the handover record and the time record of the operation desk, and handle the handover procedures.
 
 
2. Weeks cases confirmed
 
The weekly routine shall be carried out by the equipment operator every weekend. The maintenance time shall be 2h for general equipment, 4h for fine, large and thin equipment.
 
(1) clean the guide rails, drive parts and exposed parts of the equipment externally, and clean the working area. Inside and outside clean, no dead Angle, no rust, clean environment.
 
(2) control drive to check the technical status of each part, tighten the loose part, and adjust the fit clearance. Check interlocking and safety devices. The transmission sound is normal, safe and reliable.
 
(3) hydraulic lubrication to clean oil lines and filters, and add inspection oil to the tank. Check the hydraulic system to ensure that the oil is clean, the oil road is unimpeded, no leakage, no abrasion.
 
(4) the electric system can wipe the surface of motors and snakeskin pipes, check the insulation and grounding, and achieve integrity, cleanliness and reliability.

The above:Hydraulic system piping installation principles